| DEFIANCE COUNTY ENGINEER | |||||||||
| BID TAB - 2007 GUARDRAIL INSTALLATION | |||||||||
| BIDS OPEN: THURSDAY, JULY 12, 2007 @ 11:00 A.M. | |||||||||
| ENGINEER'S ESTIMATE: $32,205.00 | |||||||||
| HUBER ROAD | LAKE ERIE CONSTRUCTION CO NORWALK OH |
M.P. DORY
CO COLUMBUS OH |
PAUL PETERSON
CO COLUMBUS OH |
||||||
| NOTES: All steel posts and ODOT approved plastic blockouts. All metal components shall be galvanized. | Unit | Total | Unit | Total | Unit | Total | |||
| Item | Description | Unit | Quantity | Cost | Cost | Cost | Cost | Cost | Cost |
| 517 | Railing (Deep Beam Rail with Steel Tubular Backup and Type 2 Steel Post and Anchor Bolts) | Foot | 62.5 | $ 50.60 | $ 3,162.50 | $ 58.50 | $ 3,656.25 | $ 61.60 | $ 3,850.00 |
| 606 | Bridge Terminal Assembly, Type 4 | Each | 4 | $ 620.00 | $ 2,480.00 | $ 580.00 | $ 2,320.00 | $ 635.00 | $ 2,540.00 |
| 606 | Type A Anchor Assembly | Each | 3 | $ 835.00 | $ 2,505.00 | $ 800.00 | $ 2,400.00 | $ 930.00 | $ 2,790.00 |
| 606 | Guardrail, Type 5, | Foot | 200 | $ 12.40 | $ 2,480.00 | $ 13.50 | $ 2,700.00 | $ 17.75 | $ 3,550.00 |
| 606 | Guardrail, Type 5, 15' Radius | Foot | 18.75 | $ 16.00 | $ 300.00 | $ 16.00 | $ 300.00 | $ 18.55 | $ 347.81 |
| 606 | Type 5 W-Beam Flared End Section | Each | 1 | $ 50.00 | $ 50.00 | $ 50.00 | $ 50.00 | $ 66.00 | $ 66.00 |
| 626 | Barrier Reflector, Type A2, Corrosion resistant metal | Each | 8 | $ 5.00 | $ 40.00 | $ 8.00 | $ 64.00 | $ 7.80 | $ 62.40 |
| Huber Road Total | $ 11,017.50 | $ 11,490.25 | $ 13,206.21 | ||||||
| BOSTATER ROAD | |||||||||
| NOTES: All guardrail with steel posts shall use ODOT approved plastic blockouts. All metal components shall be galvanized. | Unit | Total | Unit | Total | Unit | Total | |||
| Item | Description | Unit | Quantity | Cost | Cost | Cost | Cost | Cost | Cost |
| 517 | Railing (Deep Beam Rail with Steel Tubular Backup and Type 2 Steel Post and Anchor Bolts) | Foot | 175 | $ 50.60 | $ 8,855.00 | $ 56.50 | $ 9,887.50 | $ 62.50 | $ 10,937.50 |
| 606 | Bridge Terminal Assembly, Type 4 | Each | 3 | $ 620.00 | $ 1,860.00 | $ 580.00 | $ 1,740.00 | $ 585.00 | $ 1,755.00 |
| 606 | Bridge Terminal Assembly, Type 4, Steel Posts | Each | 1 | $ 775.00 | $ 775.00 | $ 600.00 | $ 600.00 | $ 635.00 | $ 635.00 |
| 606 | Type A Anchor Assembly | Each | 1 | $ 835.00 | $ 835.00 | $ 800.00 | $ 800.00 | $ 995.00 | $ 995.00 |
| 606 | Guardrail, Type 5 | Foot | 318.75 | $ 12.40 | $ 3,952.50 | $ 13.50 | $ 4,303.13 | $ 14.40 | $ 4,590.00 |
| 606 | Guardrail, Type 5, Steel Posts | Foot | 12.5 | $ 15.20 | $ 190.00 | $ 16.00 | $ 200.00 | $ 17.75 | $ 221.88 |
| 606 | Guardrail, Type 5, 10' Radius | Foot | 18.75 | $ 16.00 | $ 300.00 | $ 16.00 | $ 300.00 | $ 16.50 | $ 309.38 |
| 606 | Guardrail, Type 5, Buried in slope | Foot | 12.5 | $ 24.00 | $ 300.00 | $ 75.00 | $ 937.50 | $ 84.50 | $ 1,056.25 |
| 606 | Type 5 W-Beam Flared End Section | Each | 1 | $ 50.00 | $ 50.00 | $ 50.00 | $ 50.00 | $ 66.00 | $ 66.00 |
| 626 | Barrier Reflector, Type A2, Corrosion resistant metal | Each | 8 | $ 5.00 | $ 40.00 | $ 8.00 | $ 64.00 | $ 7.80 | $ 62.40 |
| Bostater Road Total | $ 17,157.50 | $ 18,882.13 | $ 20,628.41 | ||||||
| COMBINED TOTAL | $ 28,175.00 | $ 30,372.38 | $ 33,834.62 | ||||||