Defiance County Engineer's Office
2009 Cement Stabilization and Chip Seal
BIDS OPEN: Monday, June 22, 2009
10:00 AM
Base Construction Technologies CemBase Inc Tenmile Creek Excavating
Columbus, OH Twinsburg, OH Detroit, MI  
Item Description Quantity Units   Total                  
Special Full Depth, Chemical Stabilized Base Course (12",12") 9387 SY   ########   $2.85 $26,752.95   $2.87 $26,940.69   $2.20 $20,651.40
  Rosedale Road 12" Pass 1,12" Pass 2, 16' wide                          
Special Full Depth, Chemical Stabilized Base Course 9387 SY   ########   $2.85 $26,752.95   $3.00 $28,161.00   $2.20 $20,651.40
  Porter Road 14" Pass 1, 14" Pass 2, 16' Wide                          
Special Full Depth, Chemical Stabilized Base Course 9387 SY   ########   $2.85 $26,752.95   $2.87 $26,940.69   $2.20 $20,651.40
  Hammon Road 12" Pass 1, 12" Pass 2, 16' Wide                          
Special Full Depth, Chemical Stabilized Base Course 11400 SY   ########   $2.85 $32,490.00   $2.87 $32,718.00   $2.20 $25,080.00
  Beerbower Road 12" Pass 1, 12" Pass 2, 18' Wide                          
Special Full Depth, Chemical Stabilized Base Course 12910 SY   ########   $2.85 $36,793.50   $3.00 $38,730.00   $2.20 $28,402.00
  Blosser Road 17" Pass 1, 12" Pass 2, 22' Wide                          
203 Linear Grading 10560 LF   $8,690.88   $0.92 $9,715.20   $1.60 $16,896.00   $1.00 $10,560.00
Special Portland Cement 1427 Tons   ########   $103.00 $146,981.00   $97.00 $138,419.00   $103.00 $146,981.00
Special Water 91 M Gal   $1,820.00   $50.00 $4,550.00   $10.00 $910.00   $14.00 $1,274.00
624 Mobilization 5 Each   ########   $1,200.00 $6,000.00   $2,500.00 $12,500.00   $5,000.00 $25,000.00
408 Bituminous Prime Coat 18363 Gal   ########   $1.78 $32,686.14   $1.70 $31,217.10   $1.70 $31,217.10
409 Seal Coat Bituminous Material-MWS90 43023 Gal   ########   $1.94 $83,464.62   $1.85 $79,592.55   $1.80 $77,441.40
409B Brooming Finished Pavement 5.1 Miles   $765.00   $52.50 $267.75   $50.00 $255.00   $199.00 $1,014.90
#8A Seal Coat Cover Aggregate in Place 1469 Tons   ########   $23.60 $34,668.40   $22.50 $33,052.50   $22.00 $32,318.00
614 Traffic Control 5 Each   $500.00   $1,000.00 $5,000.00   $700.00 $3,500.00   $2,500.00 $12,500.00
########   $472,875.46   $469,832.53   $453,742.60