DEFIANCE COUNTY ENGINEER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mulligans Bluff Road |
|
|
|
|
|
|
|
|
|
|
|
|
|
Bid Date: |
Monday, March 05, 2012 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Engineer's
Estimate: |
$557,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RG Zachrich |
|
Miller Brothers Construction |
|
Vernon Nagel, Inc |
|
Miller Contracting Group |
|
|
|
|
Defiance, OH |
|
Archbold, OH |
|
Napoleon, OH |
|
Ottoville, OH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UNIT |
TOTAL |
|
UNIT |
TOTAL |
|
UNIT |
TOTAL |
|
UNIT |
TOTAL |
ITEM |
DESCRIPTION |
QTY. |
|
COST |
COST |
|
COST |
COST |
|
COST |
COST |
|
COST |
COST |
|
ROADWAY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Item |
Description |
Quantity |
Units |
Unit |
Amount |
|
Unit |
Amount |
|
Unit |
Amount |
|
Unit |
Amount |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Roadway |
|
|
|
|
|
|
|
|
|
|
|
|
|
201 |
Clearing and
Grubbing |
1 |
Lump |
$
9,057.00 |
$9,057.00 |
|
$10,000.00 |
$10,000.00 |
|
$10,000.00 |
$10,000.00 |
|
$7,000.00 |
$7,000.00 |
202 |
Structure
Removed |
1 |
Lump |
$
15,151.94 |
$15,151.94 |
|
$25,000.00
|
$25,000.00 |
|
$10,000.00
|
$10,000.00 |
|
$8,000.00
|
$8,000.00 |
202 |
Guardrail
Removal |
40 |
Foot |
$ 1.10 |
$44.00 |
|
$1.50
|
$60.00 |
|
$2.00
|
$80.00 |
|
$4.50
|
$180.00 |
202 |
Fence Removed |
103 |
Foot |
$ 1.59 |
$163.77 |
|
$3.00
|
$309.00 |
|
$2.00
|
$206.00 |
|
$3.00
|
$309.00 |
202 |
Pipe Removed |
24 |
Foot |
$ 12.00 |
$288.00 |
|
$10.00 |
$240.00 |
|
$10.00
|
$240.00 |
|
$7.00
|
$168.00 |
202 |
Pavement Removed |
663 |
Sq. Yd. |
$ 5.00 |
$3,315.00 |
|
$2.00 |
$1,326.00 |
|
$8.00
|
$5,304.00 |
|
$3.00
|
$1,989.00 |
202 |
Wearing Course
Removed |
166 |
Sq. Yd. |
$ 8.50 |
$1,411.00 |
|
$2.00 |
$332.00 |
|
$3.50
|
$581.00 |
|
$1.00
|
$166.00 |
203 |
Excavation, As
Per Plan |
1900 |
Cu. Yd. |
$ 8.20 |
$15,580.00 |
|
$6.00 |
$11,400.00 |
|
$8.00
|
$15,200.00 |
|
$9.00
|
$17,100.00 |
203 |
Embankment |
2384 |
Cu. Yd. |
$ 5.86 |
$13,970.24 |
|
$6.00 |
$14,304.00 |
|
$8.00
|
$19,072.00 |
|
$9.25
|
$22,052.00 |
204 |
Subgrade
Compaction |
2100 |
Sq. Yd. |
$ 1.31 |
$2,751.00 |
|
$0.65 |
$1,365.00 |
|
$1.00
|
$2,100.00 |
|
$1.00
|
$2,100.00 |
606 |
Guardrail, Type
5 |
100 |
Foot |
$ 13.50 |
$1,350.00 |
|
$13.50 |
$1,350.00 |
|
$18.70
|
$1,870.00 |
|
$14.75
|
$1,475.00 |
606 |
Guardrail, Type
5, 10' Radius |
18.75 |
Foot |
$ 15.00 |
$281.25 |
|
$15.00 |
$281.25 |
|
$20.35
|
$381.56 |
|
$16.50
|
$309.38 |
606 |
W-Beam Flared
End Selection |
1 |
Each |
$ 50.00 |
$50.00 |
|
$50.00 |
$50.00 |
|
$75.00
|
$75.00 |
|
$55.00
|
$55.00 |
606 |
Bridge Terminal
Assembly, Type 4 |
4 |
Each |
$
650.00 |
$2,600.00 |
|
$650.00 |
$2,600.00 |
|
$655.00
|
$2,620.00 |
|
$725.00
|
$2,900.00 |
606 |
Type A Anchor
Assembly |
3 |
Each |
$
900.00 |
$2,700.00 |
|
$900.00 |
$2,700.00 |
|
$980.00
|
$2,940.00 |
|
$1,000.00
|
$3,000.00 |
|
Erosion Control |
|
|
|
|
|
|
|
|
|
|
|
|
|
601 |
Rock Channel
Protection, Type C |
95 |
Cu. Yd. |
$ 55.65 |
$5,286.75 |
|
$75.00 |
$7,125.00 |
|
$70.00
|
$6,650.00 |
|
$47.00
|
$4,465.00 |
601 |
Rock Channel
Protection, Type D, with Filter |
159 |
Cu. Yd. |
$ 52.45 |
$8,339.55 |
|
$75.00 |
$11,925.00 |
|
$65.00
|
$10,335.00 |
|
$50.00
|
$7,950.00 |
659 |
Seeding and
Mulching |
5531 |
Sq. Yd. |
$ 0.48 |
$2,654.88 |
|
$0.48 |
$2,654.88 |
|
$0.58
|
$3,207.98 |
|
$1.15
|
$6,360.65 |
659 |
Commercial
Fertilizer |
0.5 |
Ton |
$
480.00 |
$240.00 |
|
$480.00 |
$240.00 |
|
$500.00
|
$250.00 |
|
$350.00
|
$175.00 |
659 |
Water |
12 |
M Gal |
$ 1.00 |
$12.00 |
|
$1.00 |
$12.00 |
|
$1.00
|
$12.00 |
|
$1.00
|
$12.00 |
832 |
Erosion Control
($3000 carried to the Bid proposal) |
1 |
Each |
$
3,000.00 |
$3,000.00 |
|
$3,000.00 |
$3,000.00 |
|
$3,000.00
|
$3,000.00 |
|
$3,000.00
|
$3,000.00 |
832 |
Storm Water
Pollution Prevention Plan |
1 |
Lump |
$
3,000.00 |
$3,000.00 |
|
$2,600.00 |
$2,600.00 |
|
$2,500.00
|
$2,500.00 |
|
$2,000.00
|
$2,000.00 |
|
Drainage |
|
|
|
|
|
|
|
|
|
|
|
|
|
603 |
6" Conduit,
Type F |
50 |
Foot |
$ 4.00 |
$200.00 |
|
$1.00 |
$50.00 |
|
$4.00
|
$200.00 |
|
$8.00
|
$400.00 |
603 |
8" Conduit,
Type F |
50 |
Foot |
$ 6.00 |
$300.00 |
|
$2.00 |
$100.00 |
|
$4.00
|
$200.00 |
|
$10.00
|
$500.00 |
603 |
10"
Conduit, Type F |
50 |
Foot |
$ 8.00 |
$400.00 |
|
$3.00 |
$150.00 |
|
$5.00
|
$250.00 |
|
$12.00
|
$600.00 |
603 |
12"
Conduit, Type D, As Per Plan |
120 |
Foot |
$ 53.92 |
$6,470.40 |
|
$18.00 |
$2,160.00 |
|
$30.00
|
$3,600.00 |
|
$25.00
|
$3,000.00 |
603 |
12"
Conduit, Type F |
50 |
Foot |
$ 8.00 |
$400.00 |
|
$4.00 |
$200.00 |
|
$5.00
|
$250.00 |
|
$14.00
|
$700.00 |
605 |
Aggregate Drains |
238 |
Foot |
$ 9.00 |
$2,142.00 |
|
$6.65 |
$1,582.70 |
|
$10.00
|
$2,380.00 |
|
$10.50
|
$2,499.00 |
|
Pavement |
|
|
|
|
|
|
|
|
|
|
|
|
|
304 |
Aggregate Base |
1,246 |
Tons |
$ 26.00 |
$32,396.00 |
|
$20.00 |
$24,920.00 |
|
$22.00 |
$27,412.00 |
|
$18.25 |
$22,739.50 |
407 |
Tack Coat (0.10
Gal/Sq. Yd.) |
171 |
Gal |
$ 2.00 |
$342.00 |
|
$1.50 |
$256.50 |
|
$1.50 |
$256.50 |
|
$1.75 |
$299.25 |
408 |
Prime Coat (0.40
Gal/Sq. Yd.) |
709 |
Gal |
$ 2.05 |
$1,453.45 |
|
$2.00 |
$1,418.00 |
|
$2.00 |
$1,418.00 |
|
$2.00 |
$1,418.00 |
411 |
6"
Stabilized Crushed Aggregate |
128 |
Tons |
$ 30.00 |
$3,840.00 |
|
$25.00 |
$3,200.00 |
|
$30.00 |
$3,840.00 |
|
$20.50 |
$2,624.00 |
448 |
Asphalt Concrete Intermediate Course Type 1 PG 64-22, As Per
Plan |
166 |
Tons |
$ 96.00 |
$15,936.00 |
|
$92.00 |
$15,272.00 |
|
$92.00 |
$15,272.00 |
|
$100.00 |
$16,600.00 |
448 |
Asphalt Concrete
Surface Course Type 1 PG 64-22, As Per Plan |
127 |
Tons |
$ 96.00 |
$12,192.00 |
|
$92.00 |
$11,684.00 |
|
$92.00 |
$11,684.00 |
|
$100.00 |
$12,700.00 |
452 |
6" Non
Reinforced Concrete Pavement |
86 |
Sq. Yd. |
$ 38.00 |
$3,268.00 |
|
$45.00 |
$3,870.00 |
|
$45.00 |
$3,870.00 |
|
$53.00 |
$4,558.00 |
604 |
Monument
Assemblies |
1 |
Each |
$
651.00 |
$651.00 |
|
$570.00 |
$570.00 |
|
$500.00 |
$500.00 |
|
$800.00 |
$800.00 |
|
Structure 20
Feet and Over |
|
|
|
|
|
|
|
|
|
|
|
|
|
503 |
Unclassified
Excavation |
1 |
Lump |
$
11,532.00 |
$11,532.00 |
|
$20,500.00 |
$20,500.00 |
|
$10,000.00 |
$10,000.00 |
|
$13,000.00 |
$13,000.00 |
515 |
Prestressed Concrete Composite Box Beam Bridge Members
(CB27-48)Level 1 |
7 |
Each |
$
11,000.00 |
$77,000.00 |
|
$12,100.00 |
$84,700.00 |
|
$13,000.00 |
$91,000.00 |
|
$11,800.00 |
$82,600.00 |
Special |
Stainless Steel
Drip Strip |
176 |
Foot |
$ 10.00 |
$1,760.00 |
|
$9.00 |
$1,584.00 |
|
$10.00 |
$1,760.00 |
|
$10.00 |
$1,760.00 |
704 |
Splitface
Concrete Masonry Block |
3,474 |
Each |
$ 8.00 |
$27,792.00 |
|
$5.00 |
$17,370.00 |
|
$9.00 |
$31,266.00 |
|
$6.25 |
$21,712.50 |
704 |
Solid Concrete
Masonry Block |
1,224 |
Each |
$ 9.00 |
$11,016.00 |
|
$5.00 |
$6,120.00 |
|
$16.00 |
$19,584.00 |
|
$6.25 |
$7,650.00 |
Special |
High Strength
Woven Polypropylene Fabric |
5,453 |
Sq. Yd. |
$ 3.50 |
$19,085.50 |
|
$3.50 |
$19,085.50 |
|
$3.00 |
$16,359.00 |
|
$2.75 |
$14,995.75 |
Special |
Medium Strength
Woven Polypropylene Fabric |
729 |
Sq. Yd. |
$ 5.00 |
$3,645.00 |
|
$3.50 |
$2,551.50 |
|
$3.50 |
$2,551.50 |
|
$4.00 |
$2,916.00 |
203 |
Granular
Embankment #89 Stone |
1,670 |
Tons |
$ 25.84 |
$43,152.80 |
|
$23.00 |
$38,410.00 |
|
$24.00 |
$40,080.00 |
|
$20.00 |
$33,400.00 |
203 |
Granular
Embankment #304 Stone |
488 |
Tons |
$ 25.00 |
$12,200.00 |
|
$23.00 |
$11,224.00 |
|
$25.00 |
$12,200.00 |
|
$19.00 |
$9,272.00 |
509 |
Epoxy Coated
Reinforcing |
5,809 |
Pounds |
$ 1.13 |
$6,564.17 |
|
$1.20 |
$6,970.80 |
|
$1.25 |
$7,261.25 |
|
$1.25 |
$7,261.25 |
511 |
Class C
Concrete, As Per Plan |
4.6 |
Cu. Yd. |
$
438.00 |
$2,014.80 |
|
$450.00 |
$2,070.00 |
|
$200.00 |
$920.00 |
|
$475.00 |
$2,185.00 |
511 |
Class S
Concrete, As Per Plan |
35.3 |
Cu. Yd. |
$
525.00 |
$18,532.50 |
|
$900.00 |
$31,770.00 |
|
$600.00 |
$21,180.00 |
|
$890.00 |
$31,417.00 |
Special |
Beam Seat
Construction |
1 |
Lump |
$
4,000.00 |
$4,000.00 |
|
$1,800.00 |
$1,800.00 |
|
$1,500.00 |
$1,500.00 |
|
$2,800.00 |
$2,800.00 |
517 |
Railing-(Deep Beam Rail with Steel Tubular Backup and Type 2
Steel Post and Anchor Bolts |
137.5 |
Foot |
$ 68.00 |
$9,350.00 |
|
$68.00 |
$9,350.00 |
|
$67.00 |
$9,212.50 |
|
$74.00 |
$10,175.00 |
|
Traffic Control |
|
|
|
|
|
|
|
|
|
|
|
|
|
626 |
Barrier
Reflector, Type A2 |
8 |
Each |
$ 7.00 |
$56.00 |
|
$7.00 |
$56.00 |
|
$8.00
|
$64.00 |
|
$9.00
|
$72.00 |
|
Miscellaneous |
|
|
|
|
|
|
|
|
|
|
|
|
|
614 |
Maintaining
Traffic |
1 |
Lump |
$
2,780.00 |
$2,780.00 |
|
$4,000.00 |
$4,000.00 |
|
$3,500.00
|
$3,500.00 |
|
$3,500.00
|
$3,500.00 |
623 |
Construction
Layout Stakes |
1 |
Lump |
$
6,500.00 |
$6,500.00 |
|
$2,690.00 |
$2,690.00 |
|
$4,000.00
|
$4,000.00 |
|
$3,000.00
|
$3,000.00 |
624 |
Mobilization |
1 |
Lump |
$
6,000.00 |
$6,000.00 |
|
$10,000.00 |
$10,000.00 |
|
$10,000.00
|
$10,000.00 |
|
$24,950.00
|
$24,950.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
$434,218.00 |
|
|