| DEFIANCE COUNTY ENGINEER | |||||||||||
| Bowman Road Bridge Materials | |||||||||||
| Bid Date: | August 1,2005 | ||||||||||
| Engineer's Estimate: | $180,000.00 | ||||||||||
| R.G. Zachrich Const., Inc. | Taylor Excavating, Inc. | Miller Bros. Const., Inc. | |||||||||
| Defiance, OH | Delta, OH | Archbold, OH | |||||||||
| Unsigned Bid | |||||||||||
| UNIT | TOTAL | UNIT | TOTAL | UNIT | TOTAL | ||||||
| ITEM | DESCRIPTION | QTY. | COST | COST | COST | COST | COST | COST | |||
| 515 | Prestressed Concrete Non-composite Box Beam Bridge Members, Level 1 B33-48 x 82', 24 Degree 23 minute skew | 7 | Ea | $18,295.00 | $128,065.00 | $17,927.00 | $125,489.00 | $21,500.00 | $150,500.00 | ||
| 515 | Prestressed Concrete Non-Composite Box Beam Bridge Members, Level 1 B33-36 x 82' L.F., 24 Degree 23 Minute Skew | 2 | Ea | $18,295.00 | $36,590.00 | $17,927.00 | $35,854.00 | $17,250.00 | $34,500.00 | ||
| Special | Steel drip strip | 174 | LF | $6.00 | $1,044.00 | $10.00 | $1,740.00 | $8.00 | $1,392.00 | ||
| Total | $165,699.00 | $163,083.00 | $186,392.00 | ||||||||
| Alternate #1 | |||||||||||
| 512 | Type 3 Waterproofing | 310 | SY | $20.00 | $6,200.00 | $20.00 | $6,200.00 | $19.25 | $5,967.50 | ||