DEFIANCE COUNTY ENGINEER
DAPB
Bid Date: 9/24/2012
Engineer's Estimate: $3,137,000.00
MILLER BROS. CONST ANDERZACK-PITZEN VERNON NAGEL VTF EXCAVATION GLEASON CONSTRUCTION HELMS & SONS MILLER CONTRACTING
ARCHBOLD, OH METAMORA, OH NAPOLEON, OH CELINA, OH NAPOLEON, OH FINDLAY, OH OTTOVILLE, OH
UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
Item Description Quantity Units PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST PRICE COST
  Roadway                                
201 Clearing and Grubbing 1 Lump $ 21,500.00 $ 21,500.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 13,757.65 $ 13,757.65 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 10,000.00 $ 10,000.00
202 Pipe Removed 24" and under 1745 Foot $ 12.00 $ 20,940.00 $ 15.00 $ 26,175.00 $ 10.00 $ 17,450.00 $ 7.80 $ 13,611.00 $ 7.00 $ 12,215.00 $ 2.50 $ 4,362.50 $ 5.00 $ 8,725.00
202 Pipe Removed Over 24" 1247 Foot $ 14.00 $ 17,458.00 $ 20.00 $ 24,940.00 $ 20.00 $ 24,940.00 $ 9.92 $ 12,370.24 $ 13.00 $ 16,211.00 $ 4.00 $ 4,988.00 $ 9.00 $ 11,223.00
202 Structure Removed 4 Each $ 4,500.00 $ 18,000.00 $ 8,500.00 $ 34,000.00 $ 1,000.00 $ 4,000.00 $ 2,106.97 $ 8,427.88 $ 300.00 $ 1,200.00 $ 1,000.00 $ 4,000.00 $ 225.00 $ 900.00
202 Catch Basin Removed 17 Each $ 175.00 $ 2,975.00 $ 100.00 $ 1,700.00 $ 100.00 $ 1,700.00 $ 36.57 $ 621.69 $ 200.00 $ 3,400.00 $ 200.00 $ 3,400.00 $ 150.00 $ 2,550.00
202 Inlet Removed 5 Each $ 350.00 $ 1,750.00 $ 50.00 $ 250.00 $ 150.00 $ 750.00 $ 88.36 $ 441.80 $ 200.00 $ 1,000.00 $ 200.00 $ 1,000.00 $ 230.00 $ 1,150.00
202 Headwall Removed 30 Each $ 225.00 $ 6,750.00 $ 50.00 $ 1,500.00 $ 100.00 $ 3,000.00 $ 117.81 $ 3,534.30 $ 100.00 $ 3,000.00 $ 200.00 $ 6,000.00 $ 150.00 $ 4,500.00
202 Retaining Wall Removed 169 Foot $ 20.00 $ 3,380.00 $ 20.00 $ 3,380.00 $ 10.00 $ 1,690.00 $ 5.89 $ 995.41 $ 5.00 $ 845.00 $ 10.00 $ 1,690.00 $ 9.00 $ 1,521.00
202 Guardrail Removal 360 Foot $ 1.50 $ 540.00 $ 1.50 $ 540.00 $ 1.50 $ 540.00 $ 3.93 $ 1,414.80 $ 2.00 $ 720.00 $ 5.00 $ 1,800.00 $ 4.50 $ 1,620.00
202 Sidewalk Removed 40 Sq. Ft. $ 4.00 $ 160.00 $ 5.00 $ 200.00 $ 1.00 $ 40.00 $ 1.21 $ 48.40 $ 2.00 $ 80.00 $ 24.00 $ 960.00 $ 3.00 $ 120.00
202 Pavement Removal 6184 Sq. Yd. 5 $ 30,920.00 8 $ 49,472.00 1.25 $ 7,730.00 3.08 $ 19,046.72 5 $ 30,920.00 2.2 $ 13,604.80 6 $ 37,104.00
202 Base Removed 2240 Sq. Yd. $ 5.00 $ 11,200.00 $ 2.00 $ 4,480.00 $ 2.00 $ 4,480.00 $ 2.31 $ 5,174.40 $ 5.00 $ 11,200.00 $ 3.50 $ 7,840.00 $ 3.00 $ 6,720.00
606 Guardrail, Type 5, As Per Plan 1443.75 Foot $ 14.80 $ 21,367.50 $ 15.00 $ 21,656.25 $ 14.80 $ 21,367.50 $ 17.11 $ 24,702.56 $ 19.00 $ 27,431.25 $ 19.00 $ 27,431.25 $ 15.25 $ 22,017.19
606 Guardrail, Type 5, 10' Radius, As Per Plan 12.5 Foot $ 19.80 $ 247.50 $ 20.00 $ 250.00 $ 19.80 $ 247.50 $ 22.89 $ 286.13 $ 20.00 $ 250.00 $ 40.00 $ 500.00 $ 19.00 $ 237.50
606 Guardrail, Type 5, 15' Radius, As Per Plan 25 Foot $ 19.40 $ 485.00 $ 20.00 $ 500.00 $ 19.40 $ 485.00 $ 22.43 $ 560.75 $ 20.00 $ 500.00 $ 25.00 $ 625.00 $ 19.00 $ 475.00
606 Guardrail, Type 5, 40' Radius, As Per Plan 25 Foot $ 18.80 $ 470.00 $ 20.00 $ 500.00 $ 18.80 $ 470.00 $ 21.73 $ 543.25 $ 20.00 $ 500.00 $ 25.00 $ 625.00 $ 19.00 $ 475.00
606 W-Beam Flared End Section 2 Each $ 55.00 $ 110.00 $ 55.00 $ 110.00 $ 55.00 $ 110.00 $ 63.59 $ 127.18 $ 70.00 $ 140.00 $ 100.00 $ 200.00 $ 50.00 $ 100.00
203 Excavation, As Per Plan 30,519 Cu. Yd. $ 5.50 $ 167,854.50 $ 6.00 $ 183,114.00 $ 10.00 $ 305,190.00 $ 7.10 $ 216,684.90 $ 9.00 $ 274,671.00 $ 3.00 $ 91,557.00 $ 5.67 $ 173,042.73
203 Embankment 29,332 Cu. Yd. $ 3.00 $ 87,996.00 $ 3.00 $ 87,996.00 $ 4.00 $ 117,328.00 $ 4.55 $ 133,460.60 $ 2.00 $ 58,664.00 $ 4.00 $ 117,328.00 $ 4.50 $ 131,994.00
203 Embankment, As Per Plan 2,319 Cu. Yd. $ 22.00 $ 51,018.00 $ 19.00 $ 44,061.00 $ 20.00 $ 46,380.00 $ 16.42 $ 38,077.98 $ 5.00 $ 11,595.00 $ 5.00 $ 11,595.00 $ 7.85 $ 18,204.15
204 Subgrade Compaction 39,614 Sq. Yd. $ 0.35 $ 13,864.90 $ 0.10 $ 3,961.40 $ 0.50 $ 19,807.00 $ 0.41 $ 16,241.74 $ 0.50 $ 19,807.00 $ 0.50 $ 19,807.00 $ 0.90 $ 35,652.60
511 Class C Concrete, As Per Plan 33 Cu. Yd. $ 505.00 $ 16,665.00 NO BID NO BID $ 225.00 $ 7,425.00 $ 361.55 $ 11,931.15 $ 100.00 $ 3,300.00 $ 800.00 $ 26,400.00 $ 267.00 $ 8,811.00
704 Standard Concrete Masonry Block 10,693 Each $ 5.00 $ 53,465.00 $ 5.00 $ 53,465.00 $ 7.50 $ 80,197.50 $ 5.50 $ 58,811.50 $ 6.00 $ 64,158.00 $ 11.00 $ 117,623.00 $ 4.95 $ 52,930.35
Special Medium Strength Woven Polypropylene Fabric 8,724 Sq. Yd. $ 4.75 $ 41,439.00 $ 2.00 $ 17,448.00 $ 3.50 $ 30,534.00 $ 1.91 $ 16,662.84 $ 1.65 $ 14,394.60 $ 5.00 $ 43,620.00 $ 2.50 $ 21,810.00
Special Mailbox Support System, Single 41 Each $ 95.00 $ 3,895.00 $ 95.00 $ 3,895.00 $ 95.00 $ 3,895.00 $ 126.33 $ 5,179.53 $ 110.00 $ 4,510.00 $ 150.00 $ 6,150.00 $ 95.00 $ 3,895.00
Special Mailbox Support System, Double 4 Each $ 145.00 $ 580.00 $ 145.00 $ 580.00 $ 145.00 $ 580.00 $ 126.33 $ 505.32 $ 130.00 $ 520.00 $ 200.00 $ 800.00 $ 150.00 $ 600.00
  Erosion Control                                
601 Rock Channel Protection, Type B w/ filter 115 Cu. Yd. $ 69.00 $ 7,935.00 $ 36.00 $ 4,140.00 $ 85.00 $ 9,775.00 $ 66.14 $ 7,606.10 $ 55.00 $ 6,325.00 $ 60.00 $ 6,900.00 $ 60.00 $ 6,900.00
601 Rock Channel Protection, Type C w/ filter 71 Cu. Yd. $ 80.00 $ 5,680.00 $ 36.00 $ 2,556.00 $ 80.00 $ 5,680.00 $ 80.85 $ 5,740.35 $ 52.00 $ 3,692.00 $ 65.00 $ 4,615.00 $ 60.00 $ 4,260.00
601 Rock Channel Protection, Type D w/ Filter 20 Cu. Yd. $ 96.00 $ 1,920.00 $ 31.00 $ 620.00 $ 75.00 $ 1,500.00 $ 89.89 $ 1,797.80 $ 44.00 $ 880.00 $ 80.00 $ 1,600.00 $ 55.00 $ 1,100.00
659 Seeding and Mulching, As Per Plan 53,924 Sq. Yd. $ 0.42 $ 22,648.08 $ 0.50 $ 26,962.00 $ 0.42 $ 22,648.08 $ 0.74 $ 39,903.76 $ 0.45 $ 24,265.80 $ 0.55 $ 29,658.20 $ 0.90 $ 48,531.60
659 Commercial Fertilizer 5 Ton $ 460.00 $ 2,300.00 $ 460.00 $ 2,300.00 $ 460.00 $ 2,300.00 $ 531.81 $ 2,659.05 $ 460.00 $ 2,300.00 $ 100.00 $ 500.00 $ 400.00 $ 2,000.00
659 Water 116 M. Gal $ 2.00 $ 232.00 $ 2.00 $ 232.00 $ 2.00 $ 232.00 $ 2.31 $ 267.96 $ 2.00 $ 232.00 $ 1.00 $ 116.00 $ 1.00 $ 116.00
832 Temporary Sediment & Erosion Control 1 Lump $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00
832 Storm Water Pollution Prevention Plan 1 Each $ 3,000.00 $ 3,000.00 $ 2,500.00 $ 2,500.00 $ 7,500.00 $ 7,500.00 $ 2,023.18 $ 2,023.18 $ 1,500.00 $ 1,500.00 $ 3,000.00 $ 3,000.00 $ 2,400.00 $ 2,400.00
  Drainage                                
605 Aggregate Drains 2904 Foot $ 3.00 $ 8,712.00 $ 6.00 $ 17,424.00 $ 10.00 $ 29,040.00 $ 6.90 $ 20,037.60 $ 4.50 $ 13,068.00 $ 4.00 $ 11,616.00 $ 7.00 $ 20,328.00
605 Aggregate Drains, As per Plan 2674 Foot $ 5.50 $ 14,707.00 $ 6.00 $ 16,044.00 $ 10.00 $ 26,740.00 $ 7.39 $ 19,760.86 $ 4.50 $ 12,033.00 $ 5.00 $ 13,370.00 $ 7.00 $ 18,718.00
605 4" Shallow Pipe Underdrains 3647 Foot 8 $ 29,176.00 8 $ 29,176.00 6 $ 21,882.00 8.71 $ 31,765.37 7 $ 25,529.00 6 $ 21,882.00 8 $ 29,176.00
605 6" Shallow Pipe Underdrains 770 Foot $ 9.40 $ 7,238.00 $ 8.00 $ 6,160.00 $ 9.00 $ 6,930.00 $ 11.65 $ 8,970.50 $ 8.00 $ 6,160.00 $ 8.00 $ 6,160.00 $ 9.00 $ 6,930.00
603 Bends & Branches for Underdrains Outlets 10 Each $ 25.00 $ 250.00 $ 10.00 $ 100.00 $ 15.00 $ 150.00 $ 79.41 $ 794.10 $ 2.00 $ 20.00 $ 20.00 $ 200.00 $ 50.00 $ 500.00
602 Concrete Masonry 30 Cu. Yd. $ 1,000.00 $ 30,000.00 $ 1,500.00 $ 45,000.00 $ 1,200.00 $ 36,000.00 $ 881.24 $ 26,437.20 $ 850.00 $ 25,500.00 $ 800.00 $ 24,000.00 $ 820.00 $ 24,600.00
603 4" Conduit, Type E 117 Foot $ 8.00 $ 936.00 $ 22.00 $ 2,574.00 $ 9.00 $ 1,053.00 $ 7.94 $ 928.98 $ 20.00 $ 2,340.00 $ 15.00 $ 1,755.00 $ 5.00 $ 585.00
603 4" Conduit, Type F for Underdrain Outlet 176 Foot $ 13.00 $ 2,288.00 $ 22.00 $ 3,872.00 $ 12.00 $ 2,112.00 $ 12.58 $ 2,214.08 $ 20.00 $ 3,520.00 $ 15.00 $ 2,640.00 $ 12.00 $ 2,112.00
603 4" Conduit, Type F 100 Foot $ 8.00 $ 800.00 $ 22.00 $ 2,200.00 $ 6.00 $ 600.00 $ 7.94 $ 794.00 $ 5.00 $ 500.00 $ 15.00 $ 1,500.00 $ 5.00 $ 500.00
603 6" Conduit, Type C 9 Foot $ 30.00 $ 270.00 $ 22.00 $ 198.00 $ 18.00 $ 162.00 $ 13.81 $ 124.29 $ 27.00 $ 243.00 $ 40.00 $ 360.00 $ 14.00 $ 126.00
603 6" Conduit, Type E 603 Foot $ 13.00 $ 7,839.00 $ 22.00 $ 13,266.00 $ 15.00 $ 9,045.00 $ 9.05 $ 5,457.15 $ 15.00 $ 9,045.00 $ 12.00 $ 7,236.00 $ 12.00 $ 7,236.00
603 6" Conduit, Type F 100 Foot $ 9.50 $ 950.00 $ 22.00 $ 2,200.00 $ 6.00 $ 600.00 $ 10.31 $ 1,031.00 $ 6.00 $ 600.00 $ 15.00 $ 1,500.00 $ 7.00 $ 700.00
603 6" Conduit, Type F for Underdrain Outlets 18 Foot $ 20.00 $ 360.00 $ 22.00 $ 396.00 $ 15.00 $ 270.00 $ 13.79 $ 248.22 $ 21.00 $ 378.00 $ 40.00 $ 720.00 $ 14.00 $ 252.00
603 8" Conduit, Type E 190 Foot $ 14.50 $ 2,755.00 $ 25.00 $ 4,750.00 $ 12.00 $ 2,280.00 $ 10.08 $ 1,915.20 $ 25.00 $ 4,750.00 $ 15.00 $ 2,850.00 $ 11.00 $ 2,090.00
603 8" Conduit, Type F 100 Foot $ 10.85 $ 1,085.00 $ 25.00 $ 2,500.00 $ 8.00 $ 800.00 $ 12.82 $ 1,282.00 $ 7.00 $ 700.00 $ 18.00 $ 1,800.00 $ 10.00 $ 1,000.00
603 10" Conduit, Type E 112 Foot $ 15.00 $ 1,680.00 $ 25.00 $ 2,800.00 $ 10.00 $ 1,120.00 $ 10.95 $ 1,226.40 $ 27.00 $ 3,024.00 $ 20.00 $ 2,240.00 $ 15.00 $ 1,680.00
603 10" Conduit, Type F 50 Foot $ 10.00 $ 500.00 $ 25.00 $ 1,250.00 $ 10.00 $ 500.00 $ 10.94 $ 547.00 $ 8.00 $ 400.00 $ 25.00 $ 1,250.00 $ 12.00 $ 600.00
603 12" Conduit, Type A 706.02 63 Foot $ 42.00 $ 2,646.00 $ 125.00 $ 7,875.00 $ 36.00 $ 2,268.00 $ 44.94 $ 2,831.22 $ 41.00 $ 2,583.00 $ 65.00 $ 4,095.00 $ 44.00 $ 2,772.00
603 12" Conduit, Type B 50 Foot $ 15.00 $ 750.00 $ 125.00 $ 6,250.00 $ 12.00 $ 600.00 $ 28.54 $ 1,427.00 $ 12.00 $ 600.00 $ 30.00 $ 1,500.00 $ 22.00 $ 1,100.00
603 12"Conduit, Type B 706.02 667 Foot $ 39.00 $ 26,013.00 $ 125.00 $ 83,375.00 $ 50.00 $ 33,350.00 $ 48.01 $ 32,022.67 $ 49.00 $ 32,683.00 $ 45.00 $ 30,015.00 $ 44.00 $ 29,348.00
603 12" Conduit, Type C, Perforated As Per Plan 581 Foot $ 28.50 $ 16,558.50 $ 25.00 $ 14,525.00 $ 28.00 $ 16,268.00 $ 21.78 $ 12,654.18 $ 15.00 $ 8,715.00 $ 22.00 $ 12,782.00 $ 20.00 $ 11,620.00
603 12"Conduit, Type C, As Per Plan 1691 Foot $ 23.00 $ 38,893.00 $ 25.00 $ 42,275.00 $ 28.00 $ 47,348.00 $ 34.12 $ 57,696.92 $ 15.00 $ 25,365.00 $ 22.00 $ 37,202.00 $ 20.00 $ 33,820.00
603 12" Conduit, Type D, As Per Plan 327 Foot 19 $ 6,213.00 60 $ 19,620.00 28 $ 9,156.00 28.21 $ 9,224.67 15 $ 4,905.00 22 $ 7,194.00 25 $ 8,175.00
603 12" Conduit, Type E Perforated, As Per Plan 8301 Foot $ 10.00 $ 83,010.00 $ 20.00 $ 166,020.00 $ 12.00 $ 99,612.00 $ 16.65 $ 138,211.65 $ 13.00 $ 107,913.00 $ 21.00 $ 174,321.00 $ 11.00 $ 91,311.00
603 12"Conduit, Type E 100 Foot $ 12.00 $ 1,200.00 $ 20.00 $ 2,000.00 $ 12.00 $ 1,200.00 $ 11.87 $ 1,187.00 $ 10.00 $ 1,000.00 $ 20.00 $ 2,000.00 $ 10.00 $ 1,000.00
603 12" Conduit, Type F 100 Foot $ 10.00 $ 1,000.00 $ 20.00 $ 2,000.00 $ 12.00 $ 1,200.00 $ 11.87 $ 1,187.00 $ 10.00 $ 1,000.00 $ 20.00 $ 2,000.00 $ 10.00 $ 1,000.00
603 15" Conduit, Type B, As Per Plan 165 Foot $ 42.00 $ 6,930.00 $ 125.00 $ 20,625.00 $ 45.00 $ 7,425.00 $ 48.03 $ 7,924.95 $ 24.00 $ 3,960.00 $ 28.00 $ 4,620.00 $ 34.00 $ 5,610.00
603 15" Conduit, Type C, As Per Plan 595 Foot $ 27.00 $ 16,065.00 $ 31.00 $ 18,445.00 $ 30.00 $ 17,850.00 $ 24.82 $ 14,767.90 $ 19.00 $ 11,305.00 $ 27.00 $ 16,065.00 $ 20.00 $ 11,900.00
603 18" Conduit, Type C, As Per Plan 12 Foot $ 50.00 $ 600.00 $ 43.00 $ 516.00 $ 50.00 $ 600.00 $ 27.40 $ 328.80 $ 25.00 $ 300.00 $ 38.00 $ 456.00 $ 41.00 $ 492.00
603 24" Conduit, Type A, 706.02 146 Foot $ 62.00 $ 9,052.00 $ 150.00 $ 21,900.00 $ 65.00 $ 9,490.00 $ 63.84 $ 9,320.64 $ 52.00 $ 7,592.00 $ 55.00 $ 8,030.00 $ 52.00 $ 7,592.00
603 24"Conduit Type B, 706.02 18 Foot $ 75.00 $ 1,350.00 $ 400.00 $ 7,200.00 $ 90.00 $ 1,620.00 $ 74.15 $ 1,334.70 $ 57.00 $ 1,026.00 $ 55.00 $ 990.00 $ 52.00 $ 936.00
603 24"Conduit Type D, As Per Plan 48 Foot $ 41.00 $ 1,968.00 $ 210.00 $ 10,080.00 $ 50.00 $ 2,400.00 $ 48.85 $ 2,344.80 $ 45.00 $ 2,160.00 $ 42.00 $ 2,016.00 $ 48.00 $ 2,304.00
603 36" Conduit, Type C, As Per Plan 597 Foot $ 55.00 $ 32,835.00 $ 58.00 $ 34,626.00 $ 75.00 $ 44,775.00 $ 56.38 $ 33,658.86 $ 45.00 $ 26,865.00 $ 50.00 $ 29,850.00 $ 50.00 $ 29,850.00
603 42" Conduit, Type C, As Per Plan 1291 Foot $ 85.00 $ 109,735.00 $ 69.00 $ 89,079.00 $ 100.00 $ 129,100.00 $ 73.30 $ 94,630.30 $ 52.00 $ 67,132.00 $ 60.00 $ 77,460.00 $ 71.00 $ 91,661.00
603 42" Conduit, Type D, As Per Plan 87 Foot $ 71.00 $ 6,177.00 $ 125.00 $ 10,875.00 $ 110.00 $ 9,570.00 $ 93.60 $ 8,143.20 $ 52.00 $ 4,524.00 $ 70.00 $ 6,090.00 $ 84.00 $ 7,308.00
603 48" Conduit, Type A, 706.02 188 Foot $ 140.00 $ 26,320.00 $ 300.00 $ 56,400.00 $ 175.00 $ 32,900.00 $ 192.94 $ 36,272.72 $ 90.00 $ 16,920.00 $ 101.00 $ 18,988.00 $ 135.00 $ 25,380.00
603 48" Conduit, Type C, 706.02 196 Foot $ 125.00 $ 24,500.00 $ 200.00 $ 39,200.00 $ 140.00 $ 27,440.00 $ 174.38 $ 34,178.48 $ 90.00 $ 17,640.00 $ 101.00 $ 19,796.00 $ 110.00 $ 21,560.00
603 54" Conduit, Type C, Perforated As Per Plan 946 Foot $ 145.00 $ 137,170.00 $ 125.00 $ 118,250.00 $ 200.00 $ 189,200.00 $ 134.96 $ 127,672.16 $ 100.00 $ 94,600.00 $ 90.00 $ 85,140.00 $ 120.00 $ 113,520.00
603 60" Conduit Type C, As Per Plan 378 Foot $ 125.00 $ 47,250.00 $ 125.00 $ 47,250.00 $ 190.00 $ 71,820.00 $ 134.88 $ 50,984.64 $ 100.00 $ 37,800.00 $ 100.00 $ 37,800.00 $ 145.00 $ 54,810.00
603 84" Conduit Type A, 706.02 88 Foot $ 400.00 $ 35,200.00 $ 560.00 $ 49,280.00 $ 600.00 $ 52,800.00 $ 497.64 $ 43,792.32 $ 370.00 $ 32,560.00 $ 260.00 $ 22,880.00 $ 410.00 $ 36,080.00
603 106"x68" Conduit, Type A, 706.02 84 Foot $ 600.00 $ 50,400.00 $ 670.00 $ 56,280.00 $ 700.00 $ 58,800.00 $ 678.44 $ 56,988.96 $ 475.00 $ 39,900.00 $ 350.00 $ 29,400.00 $ 552.00 $ 46,368.00
603 Special 6" Tee As Per Plan 12 Each $ 25.00 $ 300.00 $ 250.00 $ 3,000.00 $ 25.00 $ 300.00 $ 164.38 $ 1,972.56 $ 75.00 $ 900.00 $ 120.00 $ 1,440.00 $ 80.00 $ 960.00
603 Special 8" Tee As Per Plan 4 Each $ 25.00 $ 100.00 $ 500.00 $ 2,000.00 $ 28.00 $ 112.00 $ 210.99 $ 843.96 $ 75.00 $ 300.00 $ 120.00 $ 480.00 $ 100.00 $ 400.00
603 Special 12" Tee As Per Plan 6 Each $ 50.00 $ 300.00 $ 500.00 $ 3,000.00 $ 125.00 $ 750.00 $ 384.41 $ 2,306.46 $ 75.00 $ 450.00 $ 120.00 $ 720.00 $ 190.00 $ 1,140.00
603 Special 36" Type C Conduit 30 Manufactured Bend As Per Plan 1 Each $ 500.00 $ 500.00 $ 1,500.00 $ 1,500.00 $ 800.00 $ 800.00 $ 404.77 $ 404.77 $ 800.00 $ 800.00 $ 1,050.00 $ 1,050.00 $ 565.00 $ 565.00
603 Special 42" Type C Conduit 30 Manufactured Bend As Per Plan 6 Each $ 600.00 $ 3,600.00 $ 2,500.00 $ 15,000.00 $ 1,300.00 $ 7,800.00 $ 635.87 $ 3,815.22 $ 1,200.00 $ 7,200.00 $ 1,000.00 $ 6,000.00 $ 700.00 $ 4,200.00
603 Special 48" Type A Conduit 45 Manufactured Bend, 706.02 1 Each $ 700.00 $ 700.00 $ 3,500.00 $ 3,500.00 $ 1,400.00 $ 1,400.00 $ 2,773.51 $ 2,773.51 $ 800.00 $ 800.00 $ 1,000.00 $ 1,000.00 $ 1,100.00 $ 1,100.00
603 Special 48" Type C Conduit 45 Manufactured Bend, 706.02 1 Each $ 700.00 $ 700.00 $ 3,500.00 $ 3,500.00 $ 1,400.00 $ 1,400.00 $ 2,773.51 $ 2,773.51 $ 800.00 $ 800.00 $ 1,000.00 $ 1,000.00 $ 1,100.00 $ 1,100.00
603 Special 54" Type C Conduit 30 Manufactured Bend, 706.02 1 Each $ 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 2,800.00 $ 2,800.00 $ 1,518.17 $ 1,518.17 $ 2,600.00 $ 2,600.00 $ 1,000.00 $ 1,000.00 $ 1,135.00 $ 1,135.00
603 Special 60" Type C Conduit 30 Manufactured Bend As Per Plan 2 Each $ 1,500.00 $ 3,000.00 $ 3,500.00 $ 7,000.00 $ 3,000.00 $ 6,000.00 $ 1,518.16 $ 3,036.32 $ 2,600.00 $ 5,200.00 $ 1,000.00 $ 2,000.00 $ 1,135.00 $ 2,270.00
604 Side Ditch Catch Basin No. 7 14 Each $ 950.00 $ 13,300.00 $ 800.00 $ 11,200.00 $ 1,000.00 $ 14,000.00 $ 399.09 $ 5,587.26 $ 1,000.00 $ 14,000.00 $ 850.00 $ 11,900.00 $ 685.00 $ 9,590.00
604 Catch Basin Type 5 3 Each $ 1,500.00 $ 4,500.00 $ 1,600.00 $ 4,800.00 $ 1,800.00 $ 5,400.00 $ 2,401.38 $ 7,204.14 $ 1,600.00 $ 4,800.00 $ 1,200.00 $ 3,600.00 $ 1,700.00 $ 5,100.00
604 Catch Basin No. 2-2A 5 Each $ 1,000.00 $ 5,000.00 $ 1,200.00 $ 6,000.00 $ 1,000.00 $ 5,000.00 $ 1,152.79 $ 5,763.95 $ 1,200.00 $ 6,000.00 $ 1,000.00 $ 5,000.00 $ 775.00 $ 3,875.00
604 Catch Basin No. 2-2B 23 Each $ 1,000.00 $ 23,000.00 $ 1,200.00 $ 27,600.00 $ 1,000.00 $ 23,000.00 $ 1,138.52 $ 26,185.96 $ 1,100.00 $ 25,300.00 $ 850.00 $ 19,550.00 $ 775.00 $ 17,825.00
604 Catch Basin No. 2-2B W/out Casting 1 Each $ 850.00 $ 850.00 $ 1,000.00 $ 1,000.00 $ 900.00 $ 900.00 $ 985.73 $ 985.73 $ 1,000.00 $ 1,000.00 $ 750.00 $ 750.00 $ 600.00 $ 600.00
604 Catch Basin No. 2-3 2 Each $ 1,250.00 $ 2,500.00 $ 1,300.00 $ 2,600.00 $ 1,400.00 $ 2,800.00 $ 1,484.59 $ 2,969.18 $ 1,300.00 $ 2,600.00 $ 850.00 $ 1,700.00 $ 1,100.00 $ 2,200.00
604 Catch Basin No. 2-3 With Inlet 1 Each $ 1,250.00 $ 1,250.00 $ 1,300.00 $ 1,300.00 $ 1,600.00 $ 1,600.00 $ 1,484.59 $ 1,484.59 $ 1,250.00 $ 1,250.00 $ 900.00 $ 900.00 $ 1,200.00 $ 1,200.00
604 Catch Basin No. 2-4 2 Each $ 1,700.00 $ 3,400.00 $ 1,600.00 $ 3,200.00 $ 2,800.00 $ 5,600.00 $ 1,750.49 $ 3,500.98 $ 1,600.00 $ 3,200.00 $ 1,200.00 $ 2,400.00 $ 1,500.00 $ 3,000.00
604 Special CB 2-6 Modified 1 Each $ 12,500.00 $ 12,500.00 $ 15,000.00 $ 15,000.00 $ 16,000.00 $ 16,000.00 $ 9,199.60 $ 9,199.60 $ 9,000.00 $ 9,000.00 $ 10,000.00 $ 10,000.00 $ 8,500.00 $ 8,500.00
604 Catch Basin Adjusted to Grade 2 Each $ 750.00 $ 1,500.00 $ 600.00 $ 1,200.00 $ 400.00 $ 800.00 $ 342.32 $ 684.64 $ 400.00 $ 800.00 $ 400.00 $ 800.00 $ 430.00 $ 860.00
604 Special Catch Basin Modified, As Per Plan 1 Each $ 1,000.00 $ 1,000.00 $ 1,800.00 $ 1,800.00 $ 1,000.00 $ 1,000.00 $ 687.81 $ 687.81 $ 2,000.00 $ 2,000.00 $ 800.00 $ 800.00 $ 675.00 $ 675.00
Special Sanitary Sewer Service Replaced 5 Each $ 500.00 $ 2,500.00 $ 1,500.00 $ 7,500.00 $ 150.00 $ 750.00 $ 275.84 $ 1,379.20 $ 2,500.00 $ 12,500.00 $ 1,000.00 $ 5,000.00 $ 700.00 $ 3,500.00
Special Sanitary Sewer Service Cleanout Replaced 5 Each $ 500.00 $ 2,500.00 $ 400.00 $ 2,000.00 $ 275.00 $ 1,375.00 $ 350.24 $ 1,751.20 $ 150.00 $ 750.00 $ 250.00 $ 1,250.00 $ 500.00 $ 2,500.00
Special Sanitary Sewer Service Cleanout Adjusted 5 Each $ 200.00 $ 1,000.00 $ 90.00 $ 450.00 $ 100.00 $ 500.00 $ 131.81 $ 659.05 $ 50.00 $ 250.00 $ 100.00 $ 500.00 $ 350.00 $ 1,750.00
  Pavement                                
254 Pavement Planning, Asphalt Concrete 65 Sq. Yd. $ 18.00 $ 1,170.00 $ 10.00 $ 650.00 $ 18.00 $ 1,170.00 $ 20.81 $ 1,352.65 $ 19.00 $ 1,235.00 $ 5.00 $ 325.00 $ 20.00 $ 1,300.00
301 Asphalt Concrete Base, As Per Plan 5998 Ton $ 69.00 $ 413,862.00 $ 69.00 $ 413,862.00 $ 68.00 $ 407,864.00 $ 78.62 $ 471,562.76 $ 71.00 $ 425,858.00 $ 84.00 $ 503,832.00 $ 74.00 $ 443,852.00
304 Aggregate Base 7420 Ton $ 21.50 $ 159,530.00 $ 17.00 $ 126,140.00 $ 23.00 $ 170,660.00 $ 17.31 $ 128,440.20 $ 21.00 $ 155,820.00 $ 14.50 $ 107,590.00 $ 20.00 $ 148,400.00
407 Tack Coat (0.10 Gal./Sq. Yd.) 4101 Gal $ 2.10 $ 8,612.10 $ 2.00 $ 8,202.00 $ 2.10 $ 8,612.10 $ 2.43 $ 9,965.43 $ 2.10 $ 8,612.10 $ 2.50 $ 10,252.50 $ 2.30 $ 9,432.30
408 Prime Coat (0.35 Gal./Sq. Yd.) 15957 Gal $ 2.10 $ 33,509.70 $ 2.00 $ 31,914.00 $ 2.10 $ 33,509.70 $ 2.43 $ 38,775.51 $ 2.10 $ 33,509.70 $ 2.50 $ 39,892.50 $ 2.30 $ 36,701.10
448 Asphalt Concrete Surface Course Type 1 PG64-22, As Per Plan 3425 Ton $ 80.50 $ 275,712.50 $ 82.00 $ 280,850.00 $ 80.50 $ 275,712.50 $ 93.07 $ 318,764.75 $ 84.00 $ 287,700.00 $ 84.00 $ 287,700.00 $ 88.00 $ 301,400.00
448 Asphalt Concrete Intermediate Course Type 1 PG64-22, As Per Plan 3987 Ton $ 72.00 $ 287,064.00 $ 73.00 $ 291,051.00 $ 72.00 $ 287,064.00 $ 83.24 $ 331,877.88 $ 75.00 $ 299,025.00 $ 80.00 $ 318,960.00 $ 79.00 $ 314,973.00
422 Double Chip Seal 10803 Sq. Yd. $ 3.15 $ 34,029.45 $ 3.15 $ 34,029.45 $ 3.15 $ 34,029.45 $ 3.64 $ 39,322.92 $ 3.30 $ 35,649.90 $ 3.80 $ 41,051.40 $ 3.35 $ 36,190.05
452 6" Non Reinforced Concrete Pavement 2343 Sq. Yd. $ 35.00 $ 82,005.00 $ 34.00 $ 79,662.00 $ 45.00 $ 105,435.00 $ 39.46 $ 92,454.78 $ 31.50 $ 73,804.50 $ 45.50 $ 106,606.50 $ 46.00 $ 107,778.00
  Miscellaneous                                
638 Water Valve Box Adjusted to Grade 5 Each $ 250.00 $ 1,250.00 $ 180.00 $ 900.00 $ 200.00 $ 1,000.00 $ 213.95 $ 1,069.75 $ 100.00 $ 500.00 $ 200.00 $ 1,000.00 $ 400.00 $ 2,000.00
614 Maintaining Traffic 1 Lump $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 20,000.00 $ 20,000.00 $ 11,561.05 $ 11,561.05 $ 25,000.00 $ 25,000.00 $ 30,000.00 $ 30,000.00 $ 15,000.00 $ 15,000.00
623 Constructing Layout Stakes 1 Lump $ 25,000.00 $ 25,000.00 $ 15,000.00 $ 15,000.00 $ 30,000.00 $ 30,000.00 $ 52,024.73 $ 52,024.73 $ 35,000.00 $ 35,000.00 $ 20,000.00 $ 20,000.00 $ 22,000.00 $ 22,000.00
624 Mobilization 1 Lump $ 70,000.00 $ 70,000.00 $ 46,000.00 $ 46,000.00 $ 100,000.00 $ 100,000.00 $ 38,729.52 $ 38,729.52 $ 130,000.00 $ 130,000.00 $ 25,000.00 $ 25,000.00 $ 51,800.00 $ 51,800.00
604 Monument Assemblies 8 Each $ 950.00 $ 7,600.00 $ 1,000.00 $ 8,000.00 $ 500.00 $ 4,000.00 $ 867.08 $ 6,936.64 $ 600.00 $ 4,800.00 $ 850.00 $ 6,800.00 $ 1,100.00 $ 8,800.00
        Total $ 2,999,471.73 Total $ 3,246,250.10 Total $ 3,435,191.33 Total $ 3,270,863.95 Total $ 2,971,298.85 Total $ 2,964,914.65 Total $ 3,023,006.57