| DEF-TR 106-2.80
Casebeer-Miller Road Bridge Re-Bid |
|
|
|
|
| BID
DATE: |
|
Monday, March 26, 2007 |
|
|
|
|
| Engineer's
Estimate: |
$212,923.00 |
|
|
|
|
|
|
|
|
|
R.G. Zachrich
Construction |
|
|
|
|
|
|
Defiance, OH |
|
|
|
ESTIMATED |
|
UNIT |
TOTAL |
|
| ITEM |
DESCRIPTION |
QTY. |
|
PRICE |
PRICE |
|
|
|
|
|
|
|
|
|
|
ROADWAY |
|
|
|
|
|
| 201 |
1 |
Lump |
Clearing and Grubbing |
|
$ 2,000.00 |
$
2,000.00 |
|
| 202 |
56 |
Foot |
Guardrail removed |
|
$ 2.00 |
$
112.00 |
|
| 202 |
51 |
Foot |
Pipe removed |
|
$ 7.00 |
$
357.00 |
|
| 203 |
166 |
CY |
Excavation |
|
$ 8.75 |
$
1,452.50 |
|
| 203 |
70 |
CY |
Embankment |
|
$ 23.00 |
$
1,610.00 |
|
| 204 |
304 |
SY |
Subgrade Compaction |
|
$ 0.80 |
$
243.20 |
|
| 606 |
100 |
Foot |
Guardrail, Type 5, As per plan |
|
$
19.35 |
$
1,935.00 |
|
| 606 |
4 |
Each |
Bridge Terminal Assembly, Type 4 |
|
$ 640.00 |
$
2,560.00 |
|
| 606 |
4 |
Each |
Type A Anchor Assembly |
|
$ 980.00 |
$
3,920.00 |
|
|
|
|
|
|
|
|
|
|
EROSION CONTROL |
|
|
|
|
| 601 |
29 |
CY |
Rock Channel Protection, Type B with filter |
|
$ 67.00 |
$
1,943.00 |
|
| 832 |
1 |
Lump |
Erosion Control |
|
$ 3,000.00 |
$
3,000.00 |
|
| 659 |
468 |
SY |
Seeding and Mulching |
|
$ 4.20 |
$
1,965.60 |
|
| 659 |
0.04 |
Ton |
Commercial Fertilizer |
|
$
472.50 |
$ 18.90 |
|
| 659 |
1 |
M Gallon |
Water |
|
$ 1.00 |
$ 1.00 |
|
|
|
|
|
|
|
|
|
|
DRAINAGE |
|
|
|
|
|
| 603 |
50 |
Foot |
6" Conduit, Type F |
|
$ 4.00 |
$
200.00 |
|
| 603 |
50 |
Foot |
8" Conduit, Type F |
|
$ 6.00 |
$
300.00 |
|
| 603 |
50 |
Foot |
10" Conduit, Type F |
|
$ 8.00 |
$
400.00 |
|
| 603 |
60 |
Foot |
12" Conduit, Type C |
|
$ 10.00 |
$
600.00 |
|
| 603 |
50 |
Foot |
12" Conduit, Type F |
|
$ 10.00 |
$
500.00 |
|
|
|
|
|
|
|
|
|
|
PAVEMENT |
|
|
|
|
|
| 304 |
223 |
Tons |
Aggregate Base |
|
$ 23.00 |
$
5,129.00 |
|
| 408 |
79 |
Gallon |
Prime Coat |
|
$ 2.00 |
$
158.00 |
|
| 411 |
11 |
Tons |
Stabilized Crushed Aggregate |
|
$ 37.00 |
$
407.00 |
|
| 448 |
16 |
Tons |
Asphalt Concrete Surface Course, Type 1, PG64-22 |
|
$ 173.00 |
$
2,768.00 |
|
| 448 |
22 |
Tons |
Asphalt Concrete Intermediate Course, Type 1, PG64-22 |
|
$ 173.00 |
$
3,806.00 |
|
|
|
|
|
|
|
|
|
|
STRUCTURE |
|
|
|
|
|
| 202 |
1 |
Lump |
Structure Removed |
|
$ 6,500.00 |
$
6,500.00 |
|
| 503 |
1 |
Lump |
Unclassified Excavation |
|
$ 1,000.00 |
$
1,000.00 |
|
| Special |
8 |
Each |
FRP Box Beam Bridge Member |
|
$11,336.74 |
$
90,693.92 |
|
| Special |
32 |
CY |
Lightweight Concrete |
|
$ 243.00 |
$
7,776.00 |
|
| Special |
1 |
Lump |
FRP Rebar |
|
$12,500.00 |
$
12,500.00 |
|
| 704 |
1021 |
Each |
Splitface Concrete Masonry Block |
|
$ 4.55 |
$
4,645.55 |
|
| 704 |
575 |
Each |
Solid Concrete Masonry Block |
|
$ 6.23 |
$
3,582.25 |
|
| Special |
1688 |
SY |
High Strength Woven Polypropylene Fabric |
|
$ 3.50 |
$
5,908.00 |
|
| Special |
222 |
SY |
Medium Strength Woven Polypropylene Fabric |
|
$ 6.19 |
$
1,374.18 |
|
| 203 |
311 |
CY |
Granular Embankment #89 Stone |
|
$
54.25 |
$
16,871.75 |
|
| 203 |
25 |
CY |
Granular Embankment #304 Stone |
|
$
54.25 |
$
1,356.25 |
|
| 511 |
3.89 |
CY |
Class C Concrete, As Per Plan |
|
$ 400.00 |
$
1,556.00 |
|
| Special |
1 |
Lump |
Beam Seat Construction |
|
$ 534.00 |
$
534.00 |
|
| 517 |
50 |
Foot |
Railing (Deep Beam Rail with
Steel Tubular Backup & Type 2 Steel Post and Anchor Bolt |
|
$
52.75 |
$
2,637.50 |
|
|
|
|
|
|
|
|
|
|
TRAFFIC CONTROL |
|
|
|
|
| 626 |
8 |
Each |
Barrier Reflector |
|
$ 7.85 |
$ 62.80 |
|
|
|
|
|
|
|
|
|
|
MAINTENANCE OF TRAFFIC |
|
|
|
|
| 614 |
1 |
Lump |
Maintaining Traffic |
|
$ 2,000.00 |
$
2,000.00 |
|
| 623 |
1 |
Lump |
Construction Layout Stakes |
|
$ 1,600.00 |
$
1,600.00 |
|
| 624 |
1 |
Lump |
Mobilization |
|
$ 4,500.00 |
$
4,500.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
$
200,484.40 |
|
|
|
|
|
|
|
|
|