DEFIANCE COUNTY ENGINEER
Stever Road Bridge Deck Reconstruction
Bid Date 3/17/2008
Engineer's Estimate: $255,000.00
MILLER BROS.
CONST. INC.
FORT DEFIANCE CONST.
& SUPPLY, INC.
ARCHBOLD  OH DEFIANCE  OH
UNIT TOTAL UNIT TOTAL
Item Description Quantity Units PRICE COST PRICE COST
Roadway & Channel          
202 Portions of Existing Structure Removed, As per plan 1 Lump  $19,500.00  $           19,500.00  $34,650.00  $           34,650.00
202 Guard Rail Removed 119 Foot  $        1.50  $                178.50  $        2.00  $                238.00
516 Structural Expansion Joint Including Elastomereic Strip Seal, As per plan 69 Ft.  $     320.00  $           22,080.00  $     350.00  $           24,150.00
510 Dowel Holes With Nonshrink, Non Metallic Grout 56 Each  $      12.00  $                672.00  $      25.00  $             1,400.00
513 Welded Stud Shear Connectors 1560 Each  $        2.50  $             3,900.00  $        2.50  $             3,900.00
511 Class S Concrete, Bridge Deck, As per plan  184.49 Cu. Yd.  $     560.00  $         103,314.40  $     500.00  $           92,245.00
Special Steel Drip Strip 464 Foot  $        6.00  $             2,784.00  $        7.00  $             3,248.00
509 Epoxy Coated Reinforcing Steel, As per plan  47839 Pound  $        0.85  $           40,663.15  $        0.90  $           43,055.10
512 Sealing Concrete Surfaces 115 Sq. Yd.  $      15.00  $             1,725.00  $      18.00  $             2,070.00
               
517 Railing - Twin Steel Tube Bridge Railing 400 Foot  $     128.50  $           51,400.00  $     118.00  $           47,200.00
606 Guardrail 119 Foot  $      19.50  $             2,320.50  $      15.00  $             1,785.00
606 Bridge Terminal Assembly, Type TST 4 Each  $  1,360.00  $             5,440.00  $  1,480.00  $             5,920.00
               
448 Asphalt Concrete Surface Course Type 1 PG64-22 50 Ton  $      94.00  $             4,700.00  $     120.00  $             6,000.00
  Miscellaneous            
614 Maintaining Traffic 1 Lump  $  1,050.00  $             1,050.00  $  3,000.00  $             3,000.00
624 Mobilization 1 Lump  $10,000.00  $           10,000.00  $  5,000.00  $             5,000.00
Total  $ 269,727.55 Total  $ 273,861.10